Is your site ready?
In order for our expert installation engineer to install your newly-purchased lifting equipment, it’s important to confirm that all the pre-installation and site preparation requirements are complete.
COLCE93027
COLCE93027
The British Standard BS EN 378 2/2000 states that from 29th May 2002 all systems exceeding 0.5 bar positive pressure will comply with the PED97/23/EC Regulation and require a leak test to be carried out to ensure there are no leaks in the system. Systems should be pressurised to a maximum pressure of 10 Bar for a minimum time of 10 – 15 minutes.
10 Bar Regulator
72? Charge Line
R134A Service Coupling
R1234YF Service Coupling
Foam Leak
In order for our expert installation engineer to install your newly-purchased lifting equipment, it’s important to confirm that all the pre-installation and site preparation requirements are complete.