Is your site ready?
In order for our expert installation engineer to install your newly-purchased lifting equipment, it’s important to confirm that all the pre-installation and site preparation requirements are complete.
PWPPP401AS
PWPPP401AS
Power Probe 3 Red Supplied with 23Ft Power Cable, 3 inch Probe, Battery Clip Set, Cigarette Lighter Adapter and instruction manual all supplied a storage case.
8 DIAGNOSTIC MODES
DC VOLTS
AC VOLTS RMS
AC VOLTS PEAK TO PEAK
RESISTANCE ?
FREQUENCY (HZ)
PULSE WIDTH ± (Ms)
FUEL INJECTOR
MODULE DRIVER
SUPPLIED WITH 7MTR (23FT) CABLE
AUTO RESET 8 AMP CIRCUIT BREAKER
12 TO 24 VOLTS
LCD DISPLAY
BACK LIGHT
MULTIPLE READING ON ONE SCREEN
ROBUST HOUSING
LED WORK LIGHTS
In order for our expert installation engineer to install your newly-purchased lifting equipment, it’s important to confirm that all the pre-installation and site preparation requirements are complete.