Is your site ready?
In order for our expert installation engineer to install your newly-purchased lifting equipment, it’s important to confirm that all the pre-installation and site preparation requirements are complete.
PWPPPECT3000
PWPPPECT3000
The ECT3000 makes locating shorts and opens quicker and with more accuracy than ever before, without the need to remove panles, mouldings or carpets.
TRACE SHORT CIRCUIT TO CHASSIS GROUND
TRACE BATTERY DRAIN & DRAW
ISOLATE CIRCUITS
VERIFY SHORT CIRCUIT TO GROUND
VERIFY OPEN CIRCUIT
SHORT CIRCUIT INSIDE WIRE HARNESS
RECEPTION DISTANCE 1” TO 8”
TRACE CIRCUITS BEHIND PANELS & CARPETS
AUDIBLE WARNING TONES
LED WARNING INDICATORS
AUTO SHUT OFF ON RECIEVER
12-24VOLT
20FT CABLE
ADDTIONAL CONNECTORS
WIRELESS RECEIVER
In order for our expert installation engineer to install your newly-purchased lifting equipment, it’s important to confirm that all the pre-installation and site preparation requirements are complete.